top of page
The project focused on relocating P2.5 Unilumin LED screens from Sydney to Channel 7 Studios in Brisbane.
Despite the challenge of outdated panels, our team integrated them into a custom ground support system.
This allowed the set designer to create scenery components that complemented the screens.
The setup included a Novastar H5 series video splicer and the Snoop GS01 steel frame.
Overall, the LED screens covered approximately 300 square meters, providing a modern and functional studio set.
The standard structural design of Snoop GS01 features adjustable base units that ensure precise leveling of the panels, maintaining uniformity in their placement. The custom-designed fixing connections offer unparalleled accuracy in installation.
bottom of page